AFI 63-501 PDF

Instruction (AFI) _IP, Management Of Aviation Critical Safety Items; Air Force Policy. Directive , AFMC Quality Assurance; and. Find the most up-to-date version of AFI at Engineering Additionally, this AF Instruction (AFI) implements the policies in management is contained in AFI , Air Force Acquisition Quality.

Author: Shakagul Nikorg
Country: Barbados
Language: English (Spanish)
Genre: Technology
Published (Last): 1 June 2010
Pages: 151
PDF File Size: 9.73 Mb
ePub File Size: 10.94 Mb
ISBN: 601-8-44993-249-2
Downloads: 17379
Price: Free* [*Free Regsitration Required]
Uploader: Tubar

Change requests address not only new or changed requirements e.

Looking for other ways to read this?

The description area contains amplification and clarification of the practice. Register for a free account to start saving and receiving special member only perks. Tailoring is accomplished in one of two ways. Establish a preventative maintenance program based on the principles of RCM which is the optimum mix of reactive, proactive, time or interval-based, and condition based maintenance practices to maximize system reliability while minimizing life-cycle costs. The purpose and charge of such workshop committees is not, however, to reach consensus on conclusions, findings, or recommendations.

The Verification and Validation process area can best be described by the following goals and practices. Product interoperates with the enabling systems that will be present in the operational environment VG5P2 Analyze and document the results of the validation activities Version September 74 Version September Description: In cases of low risk it is possible that no processes are formally monitored.

RG3P3 Validate requirements to ensure the evolving 63-5501 will perform as intended in the operational environment Description: Version September 6 Version September Process areas and their associated number of goals and practices are summarized in the table below: Conduct Provisioning Conferences and perform associated afii to support sustainment.

  CDV 35A PDF

As selections are made, the design space may be constricted and other alternatives examined until the most promising i.

Implement a root cause analysis and corrective action system.

MRAs can determine the adequacy of the manufacturing processes, the Quality Management System, and the production plans. CMG2P1 Identify the configuration items and related work products that will be placed under configuration management. RG4P3 Establish and maintain bidirectional traceability between requirements and work products Description: Periodically review all interface descriptions for coverage and completeness. Consider supportability risks in hardware, software and firmware.

Obtain user concurrence on top level requirements and mission profiles.

TO D 01SEP USAF DEFICIENCY REPORTING

The manufacturing strategy should be based on an assessment of current manufacturing capabilities and a realistic plan for development of any required new capabilities. Accordingly, the model itself must undergo CPI in order to remain current and relevant. Concurrent engineering is a key factor in improving the quality, development cycle, production cost, and delivery time of products. Document the description of the alternative solutions and the rationale for selection.

These actions may require adi, which may include revising the original plan, establishing new agreements, or including additional mitigation activities in the current plan.

Knowledge and skill aci can derive from project risk. Air Force USAFmany of the programs are still incurring cost growth, schedule delays, and performance problems.

Review the computing system architecture to ensure robustness, fault tolerance, reserve capacity and growth are addressed. Project Planning leads project members to think about and define all the activities required to achieve the goals of the project. When this is not feasible, identify and handle these risks.

  AUI INTERFACE PINOUT FILETYPE PDF

The Design process area focuses on product design, initial implementation and integration. Define the logical, physical, and human interfaces for the product and between product- components. Stakeholders should participate in Provisioning Conferences and associated planning to ensure appropriate sustainment support will be available and timely. Develop logical and physical views of the product that model the functionality to be performed along with the required component relationships.

Attention should be paid to interface management throughout the project.

Summary Page 10 Share Cite. VG3P3 Initiate and document corrective actions Description: RG3 Iteratively analyze and validate operational and derived requirements throughout the product life cycle RG3P1 Analyze requirements to ensure that zfi are necessary and sufficient Description: Ensure that there is accountability for performing the process afo achieving the specified results throughout the life of the process.

In implementing a particular type of maintenance practice, consider the probability and consequence of failure, available historical data, risk tolerance and resource availability. Subsequent directives from the Secretary of the Air Force and the Air Force chief of staff gave very specific instructions for upgrading and managing the acquisition workforce.